Difference between revisions of "AMOS Australia"
(→General) |
(→Replace HDD) |
||
(7 intermediate revisions by 2 users not shown) | |||
Line 11: | Line 11: | ||
datasheet: [[File:SD-350 MEANWELLSD-350DATASHEET.pdf|datasheet]] | datasheet: [[File:SD-350 MEANWELLSD-350DATASHEET.pdf|datasheet]] | ||
+ | == Modem-Router with digital output control (relay) == | ||
+ | |||
+ | [https://www.bivocom.com/wp-content/uploads/2021/08/TG451-Series-Router-User-Guide-V3.pdf Bivocom TG451 user guide ] | ||
+ | |||
+ | [https://shop.usriot.com/4G-Industrial-Cellular-Router-G809.html USR-G809 ] | ||
== Relay wiring == | == Relay wiring == | ||
+ | Relay D0 should be DFN camera. | ||
+ | Relay D1 should be Amos. | ||
+ | |||
+ | |||
+ | First design (off by default) | ||
[[File:Robert AMOS relay wiring.png|frameless|600px]] | [[File:Robert AMOS relay wiring.png|frameless|600px]] | ||
+ | |||
+ | |||
+ | New design (on by default). | ||
+ | Use a 2.2kΩ resistor. | ||
+ | |||
+ | [[File:PXL 20230105 092055680.jpg|frameless|600px]] | ||
+ | |||
+ | |||
+ | == AMOS-Spec for fireballs == | ||
+ | |||
+ | [[AMOS-Spec fireball BIOS configuration|BIOS configuration]] | ||
+ | |||
+ | |||
+ | == Replace HDD == | ||
+ | |||
+ | 1) Open the side. | ||
+ | |||
+ | 2) System shutdown. Either: | ||
+ | A) connect screen and keyboard, figure out and note the folder structure on the data HDD and how/where it is attached to the filesystem, to be able to replicate that with the new drive. Shutdown the system. | ||
+ | B) Ask the Slovak team to shut the system down. | ||
+ | |||
+ | 3) Disconnect power (either by disconnecting the cable, or switching the output off on the MPPT. | ||
+ | |||
+ | 4) Replace the HDD physically, label the old drive with masking tape (location, which system - AMOS All-sky or Spectral, date). | ||
+ | |||
+ | 5) Let the Slovak colleagues know, to verify all works well, and reformat if necessary. | ||
= Forrest = | = Forrest = |
Latest revision as of 05:24, 3 April 2025
Contents
[hide]General
Solar charger controller
user manual: File:Tracer-AN-SMS-EL-V1.0.pdf
datasheet: File:EPEVER-Datasheet Tracer-AN-10A-40A.pdf
DC-DC converter
datasheet: File:SD-350 MEANWELLSD-350DATASHEET.pdf
Modem-Router with digital output control (relay)
Relay wiring
Relay D0 should be DFN camera.
Relay D1 should be Amos.
New design (on by default).
Use a 2.2kΩ resistor.
AMOS-Spec for fireballs
Replace HDD
1) Open the side.
2) System shutdown. Either:
A) connect screen and keyboard, figure out and note the folder structure on the data HDD and how/where it is attached to the filesystem, to be able to replicate that with the new drive. Shutdown the system. B) Ask the Slovak team to shut the system down.
3) Disconnect power (either by disconnecting the cable, or switching the output off on the MPPT.
4) Replace the HDD physically, label the old drive with masking tape (location, which system - AMOS All-sky or Spectral, date).
5) Let the Slovak colleagues know, to verify all works well, and reformat if necessary.
Forrest